650 kva standby generator standby supplied and installed at 4com Head Office
|
300kva generator and powerlock cabling hired and installed to cover power outage at prestigious hotel
|
2019 has been a busy season of festivals with supply of all equipment with installation and engineer on site
|
150 kva standby generator supplied and installed at Sealife Centre
|